Skip to content

Aluminum Storefront Systems and Storefront Glass in San Bernardino

San Bernardino Window Replacement is a leading San Bernardino County glazing specialist for storefront glass in San Bernardino, CA, specializing in aluminum storefront framing, display window replacement and tempered entrance doors for retail and restaurant owners, center managers and tenant-improvement contractors. We offer complete re-fronts and fogged window units replaced in existing frames.

  • Free in-home measure
  • Written quote, opening by opening
  • NFRC label values on paper

Get a free window quote

About aluminum storefront systems & storefront glass with us

Our team provides tenant build-out glazing, door closers and thresholds, delivering a front that opens to customers on the date the lease sets, for both residential and commercial projects. We submit product data and shop drawings for the framing, glass and door hardware before anything is ordered, and the installer who sets the first bay is the same lead who walks the punch list with your manager.

From the thermal break in each aluminum mullion and the safety glass beside the door to a closer adjusted for its full sweep, our team handles every detail. Serving San Bernardino, Claremont, Redlands and Highgrove, we work the front one section at a time so the shop keeps its doors open.

Why San Bernardino Window Replacement

How We Work

The installer who measures your openings is the one who sets the new windows, from the first visit to the final walk.

Measured by the installerEvery opening sized by the person who sets the unit
Quote in writingFrame, glass package, U-factor and SHGC listed per opening
Sill flashed and testedFlashing and a water test before any trim goes back
Tidy siteFloors and furniture covered, old units hauled away the same day

What a Storefront System Is

An aluminum storefront is a framing system, not a row of windows: extruded aluminum mullions and rails are cut and assembled at the site, the glass is set into them, and the entrance doors hang in the same frame. California's energy code treats it that way too. Storefront systems are classed as site-built fenestration, glazed or assembled in the field from factory-cut framing, which is why the whole assembly is rated as one product rather than pane by pane.

The retail front has worked this way since cheap, large panes made display glass possible in the nineteenth century, and the idea has not changed: a ground floor that lets customers see in. What has changed is what the frame and glass must do. A modern front carries a thermal break so the metal does not conduct the afternoon heat inside, insulated units with Low-E glass, and safety glazing wherever people walk close to the glass.

Storefront versus curtain wall

Curtain wall is the hung, multi-storey facade of a taller building. Storefront sits on the ground floor between the slab and a header or canopy, and it is the system most retail and restaurant spaces in San Bernardino actually have.

Tenant Build-Outs and Re-Fronts

Most storefront work starts with a lease. Retail is one of San Bernardino's largest employment sectors, and every time a space changes hands the new tenant's plans tend to move the door, widen the display glass or change the look of the front. Storefronts are often altered heavily even when the rest of a building stays untouched, so a tired original front sitting next to a new neighbor is a common sight on older strips.

Re-front

The whole frame comes out and a new system goes in: new mullions, new insulated glass, new door and hardware. This is the job when the frame is bent, the finish has failed or the tenant wants a different layout.

Tenant build-out

The storefront is one line in a larger interior job, drawn by the tenant's architect and built to the general contractor's schedule. We price from those drawings and hold the date the drywall and flooring trades need the front closed.

Permits

In unincorporated areas the county asks for tenant improvement plans to be reviewed and approved before construction starts, and a change of use adds a separate tenant review. Cities run their own plan check, and the storefront drawings travel inside that package.

Entrance Doors, Closers and Thresholds

The entrance is the part of a storefront customers touch, and it carries the accessibility rules, so door work is never treated as an afterthought to the glass. The federal accessibility guidance sets the numbers we build to.

  • Clear width of at least 32 inches, measured with the door open to 90 degrees.
  • A threshold no taller than one half inch on new work, with edges above a quarter inch beveled; an existing or altered threshold may reach three quarters of an inch if both sides are beveled.
  • A closer slow enough that the door takes at least 5 seconds to swing from 90 degrees to 12 degrees.
  • Hardware mounted between 34 and 48 inches above the floor, usable with one hand and without tight grasping or twisting, so lever handles and U-shaped pulls rather than round knobs.
  • Glass doors without stiles need a bottom rail or shoe tapered at least 60 degrees from horizontal.

A closer that slams, a threshold that catches a cart or a pull handle that needs a strong grip are the usual complaints we are called about, and they are fixed as part of the new front rather than patched afterward.

Glass Choices for Heat and Safety

Glass in and beside a storefront door has to be safety glass. US building codes require tempered or laminated glass near doorways, in sliding doors and in large panes, which covers most of a retail front.

Tempered glass

Tempered glass is roughly four times as strong as ordinary annealed glass, and when it does break it falls into small, blunt pieces rather than long shards. It cannot be cut or drilled after tempering, so every piece is ordered to the measured size and the measurements have to be right the first time.

Laminated glass

Laminated glass bonds two layers to a plastic interlayer and holds together when broken. That makes forced entry harder, which matters for a shop that is empty overnight, and the interlayer blocks nearly all ultraviolet light, which slows the fading of merchandise in the display.

Solar control

A west-facing front in San Bernardino takes the full afternoon of a summer where July highs average about 96 degrees. A Low-E coating and a low solar heat gain coefficient keep that heat out of the sales floor, balanced against enough visible transmittance that the window display still reads from the parking lot.

Keeping the Store Trading During the Work

A storefront job is scheduled around sales, not around the crew. The front is replaced in sections, so one bay is open at a time while the rest of the frame stays closed and the entrance keeps working.

  • Before-opening and after-close starts for the noisiest steps, agreed with the owner in writing.
  • The entrance door changed in one session, with the old door left working until the new one is hung and adjusted.
  • No bay left open overnight: every opening is glazed or securely closed before the crew leaves.
  • Sidewalk protection and a clear path to the door while lifts and glass crates are on site.

Restaurants get the same plan built around service hours, so the dining room is never opened to the street during a lunch or dinner rush.

How a Storefront Bid Is Priced

A storefront re-front or build-out in the San Bernardino area is typically estimated at roughly $10,000 to $80,000, and the width of the front, the number of doors and the glass type move that figure most. The bid is built from the drawings or a site walk in the same order every time.

  • Takeoff by bay: width, height and glass type for each lite, numbered to the elevation.
  • Framing system and finish named, with the thermal break and the door type.
  • Door hardware: closers, pulls, locks, thresholds and any automatic operator the plans call for.
  • Submittals, the NFRC label values for the assembly and a mock-up where the owner wants one.
  • Access, staging and sidewalk protection.
  • After-hours or before-opening work, priced as its own line.
  • Inspection and the punch list.

Every figure here is an estimate, prices are subject to change with the specification and site conditions, and the final price is the one on the written bid. Send the plans, an elevation photo with the opening widths or the tenant improvement set for a bid.

Frames, Glass and Openings

The process

How a Window Job Runs

Four steps, and nothing is ordered until you have signed off on the written quote.

  1. The measure

    We look at every opening with you, check the frames, the sills and the stucco around them, and measure each one for the unit that will go in it.

  2. The written quote

    Frame material, glass package, label values, install method and the order date arrive in writing. For a community or a commercial building the work is split into phases, so every resident or tenant knows their day.

  3. Install and flash

    Old units come out, openings are checked for water damage, and each new window is set, flashed and sealed, with a water test at the sill before trim goes back.

  4. The final walk

    We open and lock every window and door with you before calling it finished, and adjust anything you flag.

Questions

Aluminum Storefront Systems & Storefront Glass: Common Questions

Can my store stay open while the storefront is replaced?

Yes. The front comes out one bay at a time, the door is changed in a single session, and nothing is left open overnight, so customers keep using the entrance through the job.

Can you replace only the glass and keep the existing aluminum frame?

Often, when the frame is straight and the finish is sound. Fogged or cracked insulated units are replaced in place; a bent frame or a layout change means a full re-front.

Do you work from the tenant's architectural drawings?

Yes. On a tenant build-out we price from the storefront elevations and door schedule in the plan set and build to the general contractor's sequence.

Does the glass beside my door have to be tempered?

Glass next to a doorway and in the door itself has to be safety glass, tempered or laminated, under US building codes. We specify it on the bid rather than leaving it to the inspection.

Can you fix a door that slams or is hard to open?

As part of a storefront replacement, yes: the closer is set so the door takes at least 5 seconds to close from fully open, and the pull and threshold are brought in line with accessibility guidance.

What glass is best for a west-facing storefront?

An insulated unit with a Low-E coating and a low solar heat gain coefficient, chosen so the display still shows clearly. Laminated glass adds security for a shop that sits empty overnight.

How soon can a new front be installed after the bid is accepted?

The order date, the lead time for the framing and glass, and the install day are written on the schedule attached to the bid, since they depend on the system chosen.

Free in-home measure

Talk to us about aluminum storefront systems & storefront glass

Homeowners get a free measure at the house. Boards, managers and contractors can send plans or an opening count for a bid.

Call to Discuss Scope

Calls only, we do not receive text messages.

Call (909) 515-5573